Scaffold Drop Forged Half Coupler with Eye Bolt Nut

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Years
Still deciding? Get samples of US$ 5/Piece
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (14)
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
  • Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • Company Profile
  • Our Advantages
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
UTM-FH-065
Material
Steel
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Double Scaffolding
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Steel
Q235
Standard
En74-1/BS1139
Weight
0.93kg
Finsh
Zinc Plate or Hot Dipped Galvanized
Size
48.3mm 60.3mm 89mm
Keyword01
Half Coupler with L Rod
Keyword02
Forged Coupler
Keywords
Pressed Coupler
Transport Package
Bag / Pallet
Specification
25pcs/bag 50bag/pallet
Trademark
U T M
Origin
China
HS Code
7308900000
Production Capacity
500000pieces/Year

Product Description

Scaffold Drop Forged Half Coupler with Eye Bolt Nut

Product Description

Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Scaffolding Couplers are an integral part of the construction industry, and they play a vital role in the erection and disassembly of scaffolding.
 
Nanjing Uni-Tech Metalwork Company Ltd is a professional Nanjing-based enterprise which has been in operations with over ten years of manufacturer and trading of scaffolding and formworks accessories.
Drop Forged Half Coupler with Eye Nut

Has a Forged Steel Eye Nut for making rigging connections from a pipe or truss. 

The Forged Eye Nut is secured to a coupler with a 1/2" flathead socket screw with permanent loctite. The Eye Nut rigging connection is 2-3/4" below the pipe and is able to swivel for proper orientation before loading.

Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Scaffold Drop Forged Half Coupler with Eye Bolt Nut



*Dimensions:48.3-48.3mm(60.3mm 89mm)

*Meterial:Q235 steel

*Nut:21mm,22mm,23mm

*Weight 0.93kg or as per your request

*Standard:EN74,BS1139,CE and also fit for our demostic stardand , through SGS test.

*Technic:Forged or pressed

*Surface treatment:Self-color,Zinc plated ,Hot dip galvanised

*Color:Self-color(Black) , White, Yellow

*Style:British(also can produce German, American, Japanese and so on)

*Quality:good bearing capacity,durable & stable

*Price:reasonable & wonderful

*OEM service is available

Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Forged coupler raw material Q235 raw steel, process forging, surface plating white zinc treatment.
Scaffold forged coupler is a kind of scaffold connecting parts, forged coupler has high strength and hardness

The characteristics of the scaffolding forging couplers
 are as follows:

The connection between the forging coupler and the main beam and the auxiliary beam of the scaffold is fixed by the hook and the locking device, which is suitable for the large-span engineering construction.
The forging coupler is easy to assemble, easy to disassemble, and can be used many times, which reduces the construction cost and improves the operation rate.
Forged scaffolding couplers

 

Pressed coupler raw material Q235 plate, process pressed, surface plating color zinc treatment.

Compared to forged couplers, pressed couplers have a price advantage and can particularly address the production shortcomings that cannot be overcome by forging processes. Using Q235, Q355, SPHC, and other grades of steel plates, these couplers are processed into couplers that meet the requirements of BS EN74-1:2005 through processes including cutting, mold forming, galvanizing, and assembly. Compared to forged couplers, pressed couplers have a certain cost advantage and also address the production gap that cannot be achieved using some forging techniques.
 
 
Pressed scaffolding couplers
Scaffold Drop Forged Half Coupler with Eye Bolt Nut

 


The application scenarios of scaffolding couplers
 

High-rise building inside and outside grid scaffolding.

Building, hall, bridge, viaduct, tunnel and other formwork in the roof or fly mold support main frame.

Mobile work platform for electromechanical installation, hull repair and other renovation works.

Temporary viewing stands and stands were set up.

Site dormitory, warehouse or shed.
Scaffold Drop Forged Half Coupler with Eye Bolt Nut


 

According to the standards and requirements of different countries, scaffolding couplers can be divided into the following types:

Scaffold Drop Forged Half Coupler with Eye Bolt Nut

Product Parameters


Product Paramenters
 
Material Q235
Standards BS1139, EN74
Surface Zinc Plate or Hot Dipped Galvanized, gold color galvanized, self-coloured
Type British type Forged / Pressed
Weight As per customer requirements
Bolt 1/2", M14
Nut sizes 17mm, 19mm, 21mm, 22mm, 23mm
Certification ISO9001:2000, CE, SGS
Scaffolding Couplers Sizes
Double Coupler Swivel Coupler
48.3mm*48.3mm 48.3mm*48.3mm
38mm*48.3mm 38mm*48.3mm
48.3mm*60.3mm 48.3mm*60.3mm
48.3mm*89mm 48.3mm*89mm
48.3mm* 63mm 48.3mm* 63mm
48.6mm*48.6mm 48.6mm*48.6mm
60.3mm*60.3mm 60.3mm*60.3mm

Certifications

Scaffold Drop Forged Half Coupler with Eye Bolt Nut


Our Scaffolding Products
 

Scaffold Drop Forged Half Coupler with Eye Bolt Nut
Scaffold Drop Forged Half Coupler with Eye Bolt Nut

 

Scaffold Drop Forged Half Coupler with Eye Bolt Nut

Company Profile

 

Company Profile

Nanjing Uni-Tech Metal Work Co., Ltd. (U T M) is a scaffolding production and sales enterprise. We have 16 years of industry experience. Our products have EN BS and AS certificate qualifications and are exported to the United States, the United Kingdom, Australia, the United Arab Emirates, and Saudi Arabia. Singapore and other countries.
Our main products are ringlock and aluminium scaffold systems and their accessories. We have extensive experience in seating system and edge protection, we provide design solutions and suggestions.We also make scaffold couplers, cuplock scaffolding, kwikstage scaffolding ,frames,, props, screw jacks and other relative products.
We always pay attention to the needs of our customers, treat every order with a strict attitude, and control the entire process from raw material supply to cutting, stamping, welding, surface treatment, packaging, and packing to ensure quality and complete each order on schedule.

 
Scaffold Drop Forged Half Coupler with Eye Bolt Nut
 
Scaffold Drop Forged Half Coupler with Eye Bolt Nut
 
Scaffold Drop Forged Half Coupler with Eye Bolt NutScaffold Drop Forged Half Coupler with Eye Bolt Nut
 
Scaffold Drop Forged Half Coupler with Eye Bolt Nut

Our Advantages

One-Stop Service

The company provides one-to-one service to customers, receives customers smoothly 24 hours a day, gives answers and makes records when receiving customers' demands, regularly revisits customers' product problems, and guides product installation online in the later stage.

Scaffold Drop Forged Half Coupler with Eye Bolt NutScaffold Drop Forged Half Coupler with Eye Bolt Nut

Packaging & Shipping

Scaffold Drop Forged Half Coupler with Eye Bolt NutScaffold Drop Forged Half Coupler with Eye Bolt Nut

FAQ

  • What about after service ?

    Our all prducts are fully tested before despatch, and we have  traceability system. Please contact our after-service team once  you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.

  • What are the payment terms you can accept ?

    T/T and L/C, others are negotiable.

  • What is your MOQ ?

    Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.

  • Can we customize our company logo or name on products?

    Yes, we can make permanent logo or sticker on products as the requirement from the customer.

  • How fast can you finish the order ?

    U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.

  • Are you able to provide engineered drawings if needed ?

    Yes, U T M company has professional engineers who are capable of designing the most challenging scaffolding access solutions.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier